This award-winning naturalization project successfully made the dreams of Parkway stewards a reality and transformed the landscape from inaccessible fallow farmland to a thriving native Sacramento ecosystem and a great place to recreate and learn. 

Welcome to Cordova Creek

For nearly a decade, American River Parkway stewards had been dreaming about and working on plans to restore a historic creek that runs through the American River Ranch and empties into the American River. After several failed funding attempts, the project was finally funded in 2014 and creek construction began in early 2016 under the leadership of Sacramento County, the Water Forum and cbec eco engineering.

The project restored natural form and function to a portion of the channelized stream previously named the Clifton Drain. The naturalized waterway, which provides both critical habitat and water quality benefits, was renamed Cordova Creek. 

By 2017, Cordova Creek had a natural stream substrate and banks consistent with historical drainage patterns, and was planted with 10 acres of diverse riparian, wetland, and grassland vegetation. A public trail and associated signage was constructed along the creek, connecting nearby neighborhoods to the extensive Jedidiah Smith Memorial Trail

The award-winning naturalization project successfully made the dreams of Parkway stewards a reality and transformed the landscape from inaccessible fallow farmland to a thriving native Sacramento ecosystem and a great place to recreate and learn. 

Unfortunately, due to insufficient funding to replace the bridge which crosses Cordova Creek, the naturalization project did not include the lowest approximately 400 feet of the creek.   

Planning for a Naturalized Confluence

In 2019, Water Forum applied and was granted funds from the Wildlife Conservation Board’s Lower American River Conservancy Program for the Lower Cordova Creek Planning Project. Over the next few years, Water Forum will work with engineers, scientists and stakeholders to plan for the naturalization of the confluence of Cordova Creek and the lower American River.

In addition to preparing an up to 65% design for naturalization, the project will plan for access improvements aimed at better connecting the creek with the American River Ranch, facilitating educational program use of the site from Soil Born Farms and Elderberry Farms. In order to design a naturalized confluence which best enhances the ecosystem, the project includes scientific study to understand aquatic baseline conditions and determine habitat suitability for salmonids and other native species.  


Learn more:

Read an update: Cordova Creek Naturalization Project Nears Final Phase (January 2023)

Stakeholder Engagement

Preferred Alternative Design Workshop – June 7, 2021

Stakeholder Design Formulation Workshop – March 25, 2021

Visit Cordova Creek – Google Maps