Change Order

Posted on Friday, August 17th, 2018

Temperature Shutter Change

The following Folsom Dam Temperature Shutter Change Order was issued by Peggy Manza on 8/17/18:

  • Please put Unit 1 in configuration 3 at approx 7:30 am on Monday, August 20, 2018.

Configuration after changes:

 

Upper shutters – Units 1, 2, and 3 up

Middle shutters –  Unit 1 up, Units 2 and 3 down

Lower shutters – all down

 

Comment: Temperature management in the Lower American River

Ordered by:  Peggy Manza

 

Flow Change

The following change order was issued by Peggy Manza on 8/17/18:

Please make the following release changes to the American River at Nimbus:

Date         Time    From (cfs)      To (cfs)

8/21/18       2100      3,100            3,000

8/21/18       2200      3,000            2,900

8/21/18       2300      2,900            2,800

 

8/22/18       2100      2,800            2,700

8/22/18       2200      2,700            2,600

8/22/18       2300      2,600            2,500

 

8/23/18       2100      2,500            2,400

8/23/18       2200      2,400            2,300

8/23/18       2300      2,300            2,200

 

Comment:  Reduced delta needs

PostedFriday, August 17th, 2018